EEAR CANOAS

The project consists in the construction of the Canoas Wastewater Lifting Station, with all the equipment and systems required for its running and operation. This work will be carried out in the southwestern area of Soacha with the water flow of two thirds of the City, to be pumped to the future Canoas Wastewater Treatment Plant. • The EEAR Canoas will have 6 vertical axis dry-well centrifugal pumps with a capacity per pump of 6.4 m3/s for an installed capacity of 38.4 m3/s